HI-NETS: PROJECTS 

 


Current projects include the following:

Downshire Golf Complex: A total of 150 linear metres of 20m high golf ball stop netting using our structurally engineer designed suspension netting system, enabling tower spacings of 30m and minimal damage and interruption to facilities. A pulley system for nets so all maintenance and installation can be performed from the ground is currently being considered.

The Belfry: a total of 600 linear metres of 15 metre high ballstop fencing using our suspended pulley system.

Dale Hill: a total of 300 linear metres of ballstop fencing ranging in height from 5 metres to 8 metres

 

T: +44 (0) 1425 622 552    F: +44 (0) 1425 611 383    E: ajw.co@clara.net